← Backflow review queue
Backflow assembly test · 9272 Orchard Way
ApprovedFiled Aug 14, 2025 by Jamie Harlow, Summit Plumbing & Backflow · filed from phone
Report
- Date of service
- Aug 14, 2025
- Assembly type
- RP
- Serial number
- K969157
- Size
- 3/4
- Test gauge serial
- G-5552
- Gauge calibration date
- Aug 20, 2024
- Check valve 1
- 0 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 1.4 psid
- Relief valve opened at
- 3.9 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 013-85-01026
- Readings in range, no flags
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
9272 Orchard Way
Owner: Rowan Hollins
Parcel 013-85-01026