← Backflow review queue
Backflow assembly test · Maple Leaf Car Wash
ApprovedFiled Sep 29, 2025 by Emerson Brandt, Clearwater Backflow Testing · paper form read in and confirmed by staff
Report
- Date of service
- Sep 29, 2025
- Assembly type
- RP
- Serial number
- W652781
- Size
- 1
- Test gauge serial
- G-8210
- Gauge calibration date
- Aug 2, 2025
- Check valve 1
- 0.9 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 3.3 psid
- Relief valve opened at
- 2.5 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 007-86-01236
- Readings in range, no flags
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
1839 Sycamore Ct
Owner: Hollins Holdings LLC
Parcel 007-86-01236