← Backflow review queue
Backflow assembly test · 6754 Ridgeview Ln
ApprovedFiled May 22, 2026 by Hayden Okafor, Northstar Backflow Testing · filed from phone
Report
- Date of service
- May 22, 2026
- Assembly type
- DC
- Serial number
- A791407
- Size
- 1
- Test gauge serial
- G-8988
- Gauge calibration date
- Nov 26, 2025
- Check valve 1
- 6 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.1 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 131-27-01161
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
6754 Ridgeview Ln
Owner: Rowan Ellery
Parcel 131-27-01161