Washington County, ARCompliance reporting portal
Demo · made-up dataOpen the pro appChange county
← Backflow review queue

Backflow assembly test · 3273 Cedar Hollow Ln

Approved

Filed Oct 18, 2024 by Taylor Pruitt, Summit Backflow Testing · filed from phone

Report

Date of service
Oct 18, 2024
Assembly type
RP
Serial number
Z678882
Size
1
Test gauge serial
G-9086
Gauge calibration date
Apr 18, 2024
Check valve 1
7.1 psid
Check valve 1 closed tight
Yes
Check valve 2
1.9 psid
Relief valve opened at
3.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file and current for backflow tester
  • All required fields present
  • Address matches parcel 143-27-01224
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

3273 Cedar Hollow Ln
Owner: Cameron Danner
Parcel 143-27-01224