← Stormwater review queue
Stormwater facility inspection · Riverside Taqueria
ApprovedFiled Nov 10, 2023 by Jordan Fairley, Lakeside Engineering · paper form read in and confirmed by staff
Report
- Date of service
- Nov 10, 2023
- Facility type
- Dry pond
- Sediment accumulation
- 34 % of capacity
- Inlet and outlet clear
- Yes
- Erosion or embankment damage
- No
- Vegetation maintained
- Yes
- Functioning as designed
- Yes
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for professional engineer
- All required fields present
- Address matches parcel 001-67-01221
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
1942 Cedar Hollow Trl
Owner: Ramirez Holdings LLC
Parcel 001-67-01221