← Backflow review queue
Backflow assembly test · 391 Cedar Hollow Ct
ApprovedFiled Sep 1, 2025 by Logan Stroud, Ridge Backflow Testing · filed from phone
Report
- Date of service
- Sep 1, 2025
- Assembly type
- PVB
- Serial number
- B530093
- Size
- 3/4
- Test gauge serial
- G-9623
- Gauge calibration date
- Feb 8, 2025
- Check valve 1
- 8.8 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 059-14-01239
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
391 Cedar Hollow Ct
Owner: Casey Danner
Parcel 059-14-01239