← Stormwater review queue
Stormwater facility inspection · Blue Heron Pizza
ApprovedFiled Oct 17, 2026 by Logan Lindqvist, Clearwater Site Services · filed from phone
Report
- Date of service
- Oct 17, 2026
- Facility type
- Dry pond
- Sediment accumulation
- 76 % of capacity
- Inlet and outlet clear
- No
- Erosion or embankment damage
- No
- Vegetation maintained
- Yes
- Maintenance needed
- Remove sediment at forebay; clear outlet trash rack
- Functioning as designed
- No
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for professional engineer
- All required fields present
- Address matches parcel 059-11-01215
- Sediment over 50% of capacity: cleanout needed.
- Blocked inlet or outlet.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
5495 Meadow Lark Rd
Owner: Ashby Holdings LLC
Parcel 059-11-01215