← Backflow review queue
Backflow assembly test · 7590 Orchard Trl
ApprovedFiled Mar 1, 2026 by Drew Hollins, Summit Backflow Testing · filed from phone
Report
- Date of service
- Mar 1, 2026
- Assembly type
- DC
- Serial number
- W344982
- Size
- 3/4
- Test gauge serial
- G-4064
- Gauge calibration date
- May 24, 2025
- Check valve 1
- 8.3 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.7 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 071-54-01034
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
7590 Orchard Trl
Owner: Riley Brandt
Parcel 071-54-01034