← Backflow review queue
Backflow assembly test · 595 Laurel Trl
ApprovedFiled Apr 3, 2025 by Reese Calloway, Clearwater Backflow Testing · paper form read in and confirmed by staff
Report
- Date of service
- Apr 3, 2025
- Assembly type
- DC
- Serial number
- B232005
- Size
- 3/4
- Test gauge serial
- G-9754
- Gauge calibration date
- Jun 23, 2024
- Check valve 1
- 4.3 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.2 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 085-97-01093
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
595 Laurel Trl
Owner: Casey Lindqvist
Parcel 085-97-01093