Ventura County, CACompliance reporting portal
Demo · made-up dataOpen the pro appChange county
← Septic review queue

Septic maintenance (pump-out) · 9826 Stone Gate Trl

Approved

Filed Jan 6, 2021 by Jordan Stroud, Patriot Wastewater · filed from phone

Report

Date of service
Jan 6, 2021
Tank size
750 gal
Compartments
2
Gallons pumped
745 gal
Sludge depth
32 in
Scum depth
6 in
Baffles in good condition
Yes
Effluent filter
Replaced
Lids and risers secure
Yes
Disposal site
Permitted land-application site
Repair needed
Yes
Repair needed: describe
Cracked lid
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file and current for septage hauler
  • All required fields present
  • Address matches parcel 111-20-01087
  • Sludge is over a third of a typical tank depth; check for system failure.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

9826 Stone Gate Trl
Owner: Cameron Benton
Parcel 111-20-01087