← Backflow review queue
Backflow assembly test · 919 Stone Gate Dr
ApprovedFiled Jan 14, 2026 by Jamie Ramirez, Patriot Backflow Testing · filed from phone
Report
- Date of service
- Jan 14, 2026
- Assembly type
- PVB
- Serial number
- Z108563
- Size
- 1
- Test gauge serial
- G-3699
- Gauge calibration date
- Nov 19, 2025
- Check valve 1
- 6.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Jamie Ramirez, current on the service date
- All required fields present
- Address matches parcel 014-69-01151
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
919 Stone Gate Dr
Owner: Rowan Stroud
Parcel 014-69-01151