← Backflow review queue
Backflow assembly test · 2127 Meadow Lark Ct
ApprovedFiled Sep 20, 2026 by Shawn Hollins, Summit Plumbing & Backflow · paper form read in and confirmed by staff
Report
- Date of service
- Sep 20, 2026
- Assembly type
- RP
- Serial number
- B770009
- Size
- 3/4
- Test gauge serial
- G-2054
- Gauge calibration date
- Dec 26, 2025
- Check valve 1
- 3.2 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.4 psid
- Relief valve opened at
- 1.5 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 014-11-01028
- RP relief valve must open at 2.0 psid or more.
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
2127 Meadow Lark Ct
Owner: Blake Vance
Parcel 014-11-01028