← Backflow review queue
Backflow assembly test · Two Rivers Dental
ApprovedFiled Dec 21, 2025 by Blake Fairley, Valley Backflow Testing · filed from phone
Report
- Date of service
- Dec 21, 2025
- Assembly type
- RP
- Serial number
- B501743
- Size
- 2
- Test gauge serial
- G-2738
- Gauge calibration date
- Apr 13, 2025
- Check valve 1
- 7.6 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.8 psid
- Relief valve opened at
- 4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Blake Fairley, current on the service date
- All required fields present
- Address matches parcel 047-84-01355
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
6848 Spring Branch Way
Owner: Benton Holdings LLC
Parcel 047-84-01355