Pitkin County, COCompliance reporting portal
Demo · made-up dataOpen the pro appChange county
← Backflow review queue

Backflow assembly test · Two Rivers Diner

Approved

Filed Sep 4, 2024 by Jordan Ellery, Northstar Plumbing & Backflow · filed from phone

Report

Date of service
Sep 4, 2024
Assembly type
RP
Serial number
K107023
Size
2
Test gauge serial
G-8571
Gauge calibration date
Jan 26, 2024
Check valve 1
8.5 psid
Check valve 1 closed tight
Yes
Check valve 2
1.8 psid
Relief valve opened at
2.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file and current for backflow tester
  • All required fields present
  • Address matches parcel 097-92-01270
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

5696 Hickory Way
Owner: Hollins Holdings LLC
Parcel 097-92-01270