← Backflow review queue
Backflow assembly test · 9057 Turkey Hill Trl
ApprovedFiled Apr 14, 2025 by Sam Marsh, Patriot Plumbing & Backflow · filed from phone
Report
- Date of service
- Apr 14, 2025
- Assembly type
- PVB
- Serial number
- K383256
- Size
- 3/4
- Test gauge serial
- G-7246
- Gauge calibration date
- Apr 3, 2024
- Check valve 1
- 0 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 3.2 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 123-24-01057
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
9057 Turkey Hill Trl
Owner: Jamie Hollins
Parcel 123-24-01057