← Backflow review queue
Backflow assembly test · 214 Ridgeview Ct
ApprovedFiled May 11, 2026 by Jordan Ellery, Patriot Backflow Testing · filed from phone
Report
- Date of service
- May 11, 2026
- Assembly type
- RP
- Serial number
- B942855
- Size
- 3/4
- Test gauge serial
- G-4802
- Gauge calibration date
- Dec 22, 2025
- Check valve 1
- 3.8 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.8 psid
- Relief valve opened at
- 4.1 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 005-58-01240
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
214 Ridgeview Ct
Owner: Hayden Kessler
Parcel 005-58-01240